A published analysis ages silently. This page re-reads the primary records behind each document and reports whether the exact wording a stated fact rests on is still present.

What a result means. holds means the quoted wording was found in the record on the date of the run. It does not mean the statement is true, that the record is complete, or that nothing else on the page moved. changed is not a defect and not an error — it means a person needs to re-read that record before the document is relied on. unreachable means the record did not answer, and nothing is assumed about it.

Aktau Port modernisation: public-source bankability screen

Records read on 2026-08-24. Re-checked 2026-08-24: 24 of 24 quoted passages still present across 6 records.

Record Status Statement it carries Quoted wording
01 holds EBRD loan of up to EUR 35 million EUR 35,000,000.00
  holds Total project cost stated as EUR 55 million EUR 55,000,000.00
  holds EU APIF capital grant of up to EUR 10 million EUR 10 million
  holds Project identified as 53786 53786
  holds Project page states an approval date of 23 July 2025 Approval Date 23 Jul 2025
  holds The EUR block states annual capacity of 11.8 million tons 11.8 million tons
  holds The USD block states annual capacity above 17 million tonnes exceeds 17 million tonnes
02 holds Notice belongs to EBRD project 53786 EBRD Project ID: 53786
  holds Client is the Aktau port company National Company Aktau Sea Commercial Port
03 holds Notice published 26 May 2026 Publication Date: 26/05/2026
  holds Notice belongs to EBRD project 53786 EBRD Project ID: 53786
04 holds Works tender published 4 February 2026 Publication Date: 04/02/2026
  holds Works tender closed for responses on 17 April 2026 Closing Date: 17/04/2026
  holds Two-stage tender for berths reconstruction Design and Build Works for Aktau Port Berths Reconstruction
05 holds Consultancy tender published 14 July 2026 Publication Date: 14/07/2026
  holds Consultancy tender response deadline 28 August 2026 Closing Date: 28/08/2026
  holds Supervision of berths 3 and 12 Construction Supervision and Project Implementation Support
06 holds Approved by the Board of Directors on 20 September 2023 Approved by the Board of Directors on 20 September 2023
  holds Board approval sought for a senior loan of up to USD 20 million, EUR 18.3 million equivalent senior loan of up to USD 20 million (EUR 18.3 million)
  holds The borrower is wholly owned by the state through Samruk-Kazyna Republic of Kazakhstan through Sovereign Wealth Fund Samruk
  holds Annex 2 sets out the shareholding structure ANNEX 2 – SHAREHOLDING STRUCTURE Republic of Kazakhstan JSC NWF Samruk-Kazyna
  holds The borrower sits under trust management of KTZ Under trust management of KTZ
  holds Integrity due diligence was carried out with OCCO on the company, its shareholder and its manager trust management agreement (KTZ, the state-owned railway operator)
  holds The integrity section is section 6.2 and its finding is redacted In conjunction with OCCO