Source watch
Last run: 2026-08-24. Generated by scripts/check_sources.py; do not hand-edit.
A published analysis ages silently. This page re-reads the primary records behind each document and reports whether the exact wording a stated fact rests on is still present.
What a result means. holds means the quoted wording was found in the record on the date of the run. It does not mean the statement is true, that the record is complete, or that nothing else on the page moved. changed is not a defect and not an error — it means a person needs to re-read that record before the document is relied on. unreachable means the record did not answer, and nothing is assumed about it.
Aktau Port modernisation: public-source bankability screen
Records read on 2026-08-24. Re-checked 2026-08-24: 24 of 24 quoted passages still present across 6 records.
| Record | Status | Statement it carries | Quoted wording |
|---|---|---|---|
| 01 | holds | EBRD loan of up to EUR 35 million | EUR 35,000,000.00 |
| holds | Total project cost stated as EUR 55 million | EUR 55,000,000.00 |
|
| holds | EU APIF capital grant of up to EUR 10 million | EUR 10 million |
|
| holds | Project identified as 53786 | 53786 |
|
| holds | Project page states an approval date of 23 July 2025 | Approval Date 23 Jul 2025 |
|
| holds | The EUR block states annual capacity of 11.8 million tons | 11.8 million tons |
|
| holds | The USD block states annual capacity above 17 million tonnes | exceeds 17 million tonnes |
|
| 02 | holds | Notice belongs to EBRD project 53786 | EBRD Project ID: 53786 |
| holds | Client is the Aktau port company | National Company Aktau Sea Commercial Port |
|
| 03 | holds | Notice published 26 May 2026 | Publication Date: 26/05/2026 |
| holds | Notice belongs to EBRD project 53786 | EBRD Project ID: 53786 |
|
| 04 | holds | Works tender published 4 February 2026 | Publication Date: 04/02/2026 |
| holds | Works tender closed for responses on 17 April 2026 | Closing Date: 17/04/2026 |
|
| holds | Two-stage tender for berths reconstruction | Design and Build Works for Aktau Port Berths Reconstruction |
|
| 05 | holds | Consultancy tender published 14 July 2026 | Publication Date: 14/07/2026 |
| holds | Consultancy tender response deadline 28 August 2026 | Closing Date: 28/08/2026 |
|
| holds | Supervision of berths 3 and 12 | Construction Supervision and Project Implementation Support |
|
| 06 | holds | Approved by the Board of Directors on 20 September 2023 | Approved by the Board of Directors on 20 September 2023 |
| holds | Board approval sought for a senior loan of up to USD 20 million, EUR 18.3 million equivalent | senior loan of up to USD 20 million (EUR 18.3 million) |
|
| holds | The borrower is wholly owned by the state through Samruk-Kazyna | Republic of Kazakhstan through Sovereign Wealth Fund Samruk |
|
| holds | Annex 2 sets out the shareholding structure | ANNEX 2 – SHAREHOLDING STRUCTURE Republic of Kazakhstan JSC NWF Samruk-Kazyna |
|
| holds | The borrower sits under trust management of KTZ | Under trust management of KTZ |
|
| holds | Integrity due diligence was carried out with OCCO on the company, its shareholder and its manager | trust management agreement (KTZ, the state-owned railway operator) |
|
| holds | The integrity section is section 6.2 and its finding is redacted | In conjunction with OCCO |